Safety Information; Product Description; Construction - GEM R487 Victoria Operating Instructions Manual

Manually operated butterfly valve
Hide thumbs Also See for R487 Victoria:
Table of Contents

Advertisement

2 Safety information

The safety information in this document refers only to an indi-
vidual product. Potentially dangerous conditions can arise in
combination with other plant components, which need to be
considered on the basis of a risk analysis. The operator is re-
sponsible for the production of the risk analysis and for com-
pliance with the resulting precautionary measures and re-
gional safety regulations.
The document contains fundamental safety information that
must be observed during commissioning, operation and main-
tenance. Non-compliance with these instructions may cause:
Personal hazard due to electrical, mechanical and
chemical effects.
Hazard to nearby equipment.
Failure of important functions.
Hazard to the environment due to the leakage of dan-
gerous materials.
The safety information does not take into account:
Unexpected incidents and events, which may occur
during installation, operation and maintenance.
Local safety regulations which must be adhered to by
the operator and by any additional installation person-
nel.
Prior to commissioning:
1. Transport and store the product correctly.
2. Do not paint the bolts and plastic parts of the product.
3. Carry out installation and commissioning using trained
personnel.
4. Provide adequate training for installation and operating
personnel.
5. Ensure that the contents of the document have been fully
understood by the responsible personnel.
6. Define the areas of responsibility.
7. Observe the safety data sheets.
8. Observe the safety regulations for the media used.
During operation:
9. Keep this document available at the place of use.
10. Observe the safety information.
11. Operate the product in accordance with this document.
12. Operate the product in accordance with the specifications.
13. Maintain the product correctly.
14. Do not carry out any maintenance work and repairs not de-
scribed in this document without consulting the manufac-
turer first.
In cases of uncertainty:
15. Consult the nearest GEMÜ sales office.
www.gemu-group.com

3 Product description

3.1 Construction

10
8
7
8
2
3
6
Item
Name
1
Body
2
Shaft
3
Axis
4
Disc
5
Liner
6
Threaded plug
7
O-ring
8
Support rings
9
Hexagon head bolts
0
Earthing kit for ATEX
version
0-1
Cable lug (ATEX version)
0-2
Stranded wire (ATEX
version)
10
Manual operator
5 / 36
3 Product description
0-2
9
11
0-1
4
5
1
Materials
SG iron 5.3106, epoxy
coated (RAL 5021)
1.4021
1.4021
Various materials (see
order data)
Various materials (see
order data)
1.4021
NBR
PTFE
Stainless steel A2-70
Aluminium, polyurethane
coated
GG25, polyurethane
coated
GEMÜ R487

Advertisement

Table of Contents
loading

Table of Contents