Vertically Terminated Installations - Rinnai HD250i Installation Manual

Horizontal,vertical and combination flueing
Hide thumbs Also See for HD250i:

Advertisement

Vertically Terminated Installations

Air Intake
Condensate
Roof Cowl
Clearance
Rinnai New Zealand
Vertical/Combination Installation with Rinnai Flueing Components
Requires two 90° bends to prevent entry of rain.
Vertical terminations must incorporate a condensate drain and trap as
close as possible to the appliance.
Condensate drain trap must contain a minimum of 75mm.
500mm clearance shown is for simple roof pitches. Complex multiple
pitched roofing can interfere with correct flueing of the appliance and
greater clearances to flue terminals may be required. Please contact
Rinnai Specification Service for further information.
5
HD250i Combination Flueing Installation: 0-08