Figure 2.5 Remote/Local Operation Or Date & Time Adjustment Select; Figure 2.6(A) Log Menu - Mitsubishi Electric 9900D Series Owner Technical Manual

Uninterruptible power supply system
Table of Contents

Advertisement

C) OPERATION MENU (Figure 2.5)
This screen prompts the user to select: whether the start & stop operation will be performed by
local or remote operation; date & time adjustment; battery equalizing charge. The battery
equalizing charge operation key will appear when battery equalizing charge is set up (Setup is
based on battery type).
Figure 2.5 Remote/Local Operation or Date & Time Adjustment Select
D) LOG MENU (Figure 2.6)
This LOG MENU displays two Touch icons in EVENT LOG and BATTERY LOG.
Pressing the EVENT LOG icon, up to 100 condition/operation records will be displayed. Press ▲
or ▼ button for page turning.
Pressing the BATTERY LOG icon, Number of battery operations and Summed battery operation
time are displayed.
9900D SERIES UPS
OWNERS / TECHNICAL MANUAL

Figure 2.6(a) Log Menu

MITSUBISHI ELECTRIC 9900D SERIES UPS
Page Number:
2-5

Advertisement

Table of Contents
loading

Table of Contents