Sharp UP-5300 Installation Manual page 16

Pos terminal
Hide thumbs Also See for UP-5300:
Table of Contents

Advertisement

14) Wiring for each cables as shown below
Y
8
a) Attach the FERRITE CORE (S size)
to the I/F CABLE
.
8
[
b) Fix the I/F CABLE
and EARTH WIRE
with the CABLE
Z
BAND
.
c) Set the switch: SW2 to the "MRS" position.
Fig. 9
2
Y
15) Install the BOTTOM PLATE
.
16) Install the PRINTER COVER
.
29
2
1
Fig. 11
Fig. 10
– 15 –

Advertisement

Table of Contents
loading

Table of Contents