Boston Valve:
1. Double valve cap (valve lets air in; not out).
2. Quick defl ation cap.
3. Unscrew Double Valve cap.
4. Insert output end of air pump into valve and fi ll. Do not over infl ate or use high pressure compressor.
5. To defl ate: Unscrew quick-defl ation cap.
CAUTION: Double-Valve does not operate when this cap is off. Do not unscrew this cap while product
is in water.
2
1
Anchor bag installation:
1. Infl ate and assemble the fl oating structure fi rst.
2. Place the assembled structure on the water.
3. Thread the long rope through the grommets on the anchor bag.
4. The anchor bag holds about 4 to 6kg (9 to 13lb) of dead weight. Do not exceed the recommended
weight.
5.
For the dead weight, it is recommended to use pebbles or other similar rounded stones of about 1 to
2 inches (2.54 to 5 cm) in size or diameter. IMPORTANT: Never use rough stones or stones with
sharp edges or corners, as they may cause serious injury and damage the anchor bag.
6.
Sand and other fi ne particles are not recommended as dead weight, they may fall or spill out easily
from the bag, serious injury and property damage may occur.
7.
Clean the pebbles with a garden hose before placing the pebbles into the anchor bags. You may
wish to put the pebbles into a plastic carry bag fi rst and then into the anchor bag.
8.
Close the anchor bag with the end of the rope. Pull the rope tightly and tie a knot as you would tie
shoelaces.
9.
Make sure the anchor bag is securely close and tight. Slowly place the anchor bag on top of the
infl atable structure.
10. Once the infl atable structure is at the desired location, slowly lower the anchor bag into the water until
the anchor bag sits on the fl oor.
11. Tie the other free end of the rope to the grommet located on the side of the infl atable structure.
The anchor bag must be resting on the fl oor, the rope must be taut and the infl atable structure should
be fl oating parallel to the water surface.
Re-boarding Pad Installation (Certain Models):
1.
Make sure the main structure and the re-boarding pad are infl ated fi rst.
2.
Match the rope holders on the re-boarding pad with the
rope holders on the rear side of the main structure.
3.
Thread one end of the accessory line through the rope
holders on the re-boarding pad and the rear side of the
main structure. Tie the two loose ends in a square knot
making sure the re-boarding pad is contact with the main
structure.
4.
Repeat the previous step with the other rope holders.
Grab Line and Accessory Line Installation (Certain Models):
Your product may have accessory lines to install. Tie a fi gure eight knot
into one end of the accessory line and slide it through the rope holders.
Tie a fi gure eight knot in the remaining end of the rope.
SAVE THESE INSTRUCTIONS
3
Page 2
(26IO) ENGLISH 4.875" X 7.25" 06/07/2018
4
5
Square knot
Figure eight knot
26IO
Need help?
Do you have a question about the 57266EU and is the answer not in the manual?