Download Print this page

Samsung RVMH060GDM3 Installation Manual page 11

Heat pump and heat recovery
Hide thumbs Also See for RVMH060GDM3:

Advertisement

Installing the Outdoor Unit
When installing Type A outdoor unit
Install the outdoor unit higher than 300mm from the base surface and install
the drain hole to connect the pipe to the drainage.
The concrete foundation should be 1.5 times larger than bottom of the
outdoor unit.
When heating, condensed water may be generated. Pay attention to waterproof
and drainage of the concrete foundation where the outdoor unit is installed.
(An ice road may form on the base surface in winter)
300 or more
Drain hole
When installing on the ground
Install a square pad(t=10mm or more) to prevent vibration of the outdoor unit
delivering to the base surface when installing the concrete for the outdoor unit.
Fix the outdoor unit more than 4 places using the anchor bolt(M12) after
placing it on the concrete foundation.
Outdoor unit
Anchor bolt
20mm
75mm
Install the outdoor
unit horizontally on
the ground
300 or more
When installing on the roof
Square pad
Concrete foundation
A
A+10~20mm or more
Unit : mm
Anchor bolt
(Not supplied)
Nut, spring
washer
(Not supplied)
Concrete
foundation
11
E-

Hide quick links:

Advertisement

loading

This manual is also suitable for:

Rvmh100gcm3Rvmr100gcm0