Risco Industrial LuNAR DT AM Grade 3 Installation Manual

Risco Industrial LuNAR DT AM Grade 3 Installation Manual

High ceiling mount detector
Hide thumbs Also See for Industrial LuNAR DT AM Grade 3:

Advertisement

H
i
g
h
C
e
i
l
i
H
i
g
h
C
e
i
l
i
I
n
s
I
n
s
M
o
d
M
o
d
D
T
D
T
n
g
M
o
u
n
t
n
g
M
o
u
n
t
t
a
l
l
a
t
i
o
n
G
u
i
t
a
l
l
a
t
i
o
n
G
u
i
e
l
:
R
K
2
0
0
D
T
e
l
:
R
K
2
0
0
D
T
A
M
G
r
a
d
A
M
G
r
a
d
D
e
t
e
c
t
o
r
D
e
t
e
c
t
o
r
d
e
d
e
G
3
G
3
e
3
e
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Industrial LuNAR DT AM Grade 3 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Risco Industrial LuNAR DT AM Grade 3

  • Page 2: Table Of Contents

    DIP Switch Settings ........................ 15 Terminal Blocks ........................17 Walk Test ..........................18 Troubleshooting ........................19 Specifications .......................... 20 FCC Compliance Section ......................20 US Patent Number ........................21 Ordering Information ....................... 21 Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 3: General Description

    General Description The Industrial LuNAR DT AM Grade 3 (Ind. LuNAR 200DTG3) is a dual technology ceiling detector with a mounting height of up to 8.6m (28ft) that incorporates RISCO Group’s Anti- Cloak™ Technology (ACT™). The detector has an Intelligent Digital Signal Processing method...
  • Page 4: Remote Control And Diagnostic Features

    Doppler Effect. ALARM is initiated only when both technologies trigger simultaneously (except for certain situations in the ACT mode-see page 4 – “How ACT™ Works”), thus greatly reducing the possibility of false alarms. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 5: How Act™ Works

    When the Green Line feature is enabled, the detector should receive a Set/Unset indication from the security panel. For RISCO security panels the Set/Unset status will be notified via BUS, for other panels the status will be notified via the Set/Unset input terminal. (See Terminal...
  • Page 6: Ind. Lunar 200Dtg3 Configuration Options

    AM detection Steady Microwave detection Green Flashing Trouble in the MW channel Steady PIR detection Orange Flashing Trouble in the PIR channel All LEDs Flashing with change of color Upon power up Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 7: Installation

    Typical Ind. LuNAR 200DTG3 detection coverage and installation height, are illustrated below: NOTE: When installing the Ind. LuNAR 200DTG3 detector in a room occupied with high volume interfering elements, MW detection may be affected. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 8 The cover will remain attached to the base of the detector. Using a Philips screwdriver, release the upper cover screw (2) and gently pull upward the detector’s upper cover. FIGURE 1 Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 9 They are essential for correct operation of the detector. If required, open (Figure 3) the wiring channels knockout using a cutter (1, 2) and knockout holes in the rear cover (3, 4) using a screwdriver. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 10 Insert the cable via the cable opening (Figure 4) and connect the desired wires as described in “Step 4- Wiring”. FIGURE 4 Mount the rear cover in its final location (Figure 5) using the 3 mounting screws and seal the remaining open holes with sealant. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 11 Adjust the position of the lenses based on the ceiling mounting height as follows: Press the 2 clips attaching the sleeve (Figure 6) to the detector’s cover, and gently pull out the sleeve. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 12 Use the following table to select the desired lens position. Return the protective sleeve back into place on the detector front cover. Repeat steps 1 to 5 for the remaining 2 lenses. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 13 2.7m height coverage diameter is 15m (50ft). For customized coverage, it is possible to set the position of each lens to a different height, according to the installation conditions. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 14: Selectors And Jumpers

    12K FAULT/AM E.O.L resistor (see EOL Resistors Schematic). Follow the terminal block connection diagram when connecting the detector to a Double/Triple End Of Line (DEOL/TEOL) Zone. FAULT/AM EOL JUMPERS Resistor (Default) Schematic of EOL Resistors Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 15: Dip Switch Settings

    Turn dipswitch 7 “OFF” after installation and when leaving the site for security reasons. This will prevent unauthorized use of a remote control unit that may be used to disable the detector. DIP switches OFF NOTE: See Set Terminal Blocks for activation details. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 16 Not applicable (RC communication is automatically enabled when entering Walk Test mode in the ProSYS and disabled otherwise). DIP Switch ON: in order to enable the detector to report the tamper status to ProSYS. Table 1: ID Settings for BUS connection Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 17: Terminal Blocks

    The AM/FAULT output opens in the following events: s Detector is masked (ALARM also opens in this case) s Self Test failed s Input voltage is low (6VDC-8VDC) TAMPER Normally closed output ALARM Normally closed output Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 18: Walk Test

    Turn DIP switch 7 “OFF” after installation and when leaving the site for security reasons. This will prevent unauthorized use of a remote control unit, that may be used to disable the detector. Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 19: Troubleshooting

    DISARM” during ProSYS’s DISARM mode Ind. LuNAR Reset the detector. 200DTG3 If MW channel trouble reoccurs, operating in replace the detector with a new Bypass mode due to “Bypass MW channel mode” Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 20: Specifications

    However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 21: Us Patent Number

    Industrial LuNAR Remote Control RISCO Group Limited Warranty RISCO Group and its subsidiaries and affiliates ("Seller") warrants its products to be free from defects in materials and workmanship under normal use for 24 months from the date of production. Because Seller does not install or connect the product and because the product may be used in conjunction with products not manufactured by the Seller, Seller can not guarantee the performance of the security system which uses this product.
  • Page 22 No employee or representative of Seller is authorized to change this warranty in any way or grant any other warranty. WARNING: This product should be tested at least once a week Industrial LuNAR DT AM Grade 3 Installation Guide...
  • Page 23 Contacting RISCO Group RISCO Group is committed to customer service and product support. You can contact us through our website (www.riscogroup.com) or at the following telephone and fax numbers: United Kingdom Brazil Tel: +44-(0)-161-655-5500 Tel: +55-11-3661-8767 E-mail: support-uk@riscogroup.com E-mail: support-br@riscogroup.com...

This manual is also suitable for:

Rk200dtg3

Table of Contents