Preparation To Work - Axis SE-12 Technical And Motion Documentation

Balance meter
Table of Contents

Advertisement

___________________________________________________________________________________________________

7. Preparation to work

1. Construction of balance upon the basis of SE-01 meter should be ordered to the
authorized producer service, or performed according to meter assembly manual,
supplied with the meter.
Connecting extensometer sensors to meter during balance operation could
damage the meter.
Fulfilling of requirements, connected with CE sign, requires application of filter cores
during wires connecting, which are supplied with the module. Core φ20mm for sensor
(sensors) wires and cores φ16mm for protective wires – see below. Distance of core
from connection point must not exceed 30 mm.
ekran
przewody sygnałowe - 4 zwoje
All devices connected with balance should be supplied from the same line
(phase) 230V.
For the balance supply use the socket with protective contact.
TECHNICAL AND MOTION DOCUMENTATION
przewód ochronny
sieciowy - 2 zwoje
przewód ochronny
czujnika - 2 zwoje
8

Advertisement

Table of Contents
loading

Table of Contents