Installation; Scope Of Delivery; Important To Remember - CTC Union EcoComfort Installation And Maintenance Manual

Passive cooling unit
Table of Contents

Advertisement

1.

Installation

1.1

Scope of delivery

The following items are included in the delivery of a CTC EcoComfort passive
cooling unit:
• Packaging box with impact protection
• Cooling unit fitted in enclosed box containing:
– Heat exchanger
– Circulation pump (circulates brine in the collectors)
– Mixing valve with mounted steering motor, including 2 m connection
cable
– Non-return valve
– Bleeding valve for the cold side (brine)
– Support sleeves in copper pipe connections
• Non-return valve for main brine system
• Installation and Maintenance Manual
1.2

Important to remember!

Check the following points in particular at the time of delivery and installation:
• Check before installation that the product has not been damaged in
transit. Report any transportation damage to the carrier.
• Make sure the heating system is suitable for cooling, and the type of
system (underfloor heating, fan coil units).
• Make sure the product is mounted horizontally.
• Make sure the wall is suitable for installation, and no hidden electrical
cables/pipes can be damaged during installation.
• Remember to leave a service area around the product.
• The radiator system's water flow passes through the heat exchanger
in CTC EcoComfort. This is why the radiator system must be flushed
thoroughly before installation.
• The packaging must be deposited at a recycling station or with the
installation engineer for correct waste management.
• Obsolete products must be disposed of correctly and transported to a
waste station or distributor/retailer offering this service. Disposal of the
product as household waste is not permitted.
8
CTC EcoComfort

Advertisement

Table of Contents
loading

Table of Contents