Component Location - CTC Union EcoComfort Installation And Maintenance Manual

Passive cooling unit
Table of Contents

Advertisement

2.3

Component location

A. Connection water fl ow in.
B. Connection water fl ow out (cooled water).
C. Incoming connection from bedrock collector
D. Outgoing connection to bedrock collector
1.
Box with lid, tight design
2.
Cold side, brine system
3.
Hot side, heating system
4.
Heat exchanger
5.
Mixing valve with motor for cooling control
6.
Circulation pump, bore hole circulation
7.
Bleeder, cold side (brine)
8.
Non-return valve, cooling unit (in the pipe)
9.
Cables for connection to the controlling product
(2.5 m)
10. Non-return/throttle valve, main system (brine),
provided
11. Block for manual control
12
CTC EcoComfort
A
3
7
1
6
2
10
C
B
5
11
4
8
9
D

Advertisement

Table of Contents
loading

Table of Contents