Check List; The Check List Must Be Completed By The Installer; Pipe Installation; Electrical Installation - CTC Union EcoComfort Installation And Maintenance Manual

Passive cooling unit
Table of Contents

Advertisement

Check list

The check list must be completed by the installer.

• In the event of a service, this information may be called for.
• Installation shall always be done according to the Installation and maintenance manual.
• Installation shall always be carried out in a professional manner.
• Following installation, the unit shall be inspected and checked for functionality.
The points below shall be checked off.

Pipe installation

The system has been filled, positioned and adjusted in the correct manner according to the
instructions.
The products are positioned so that they can be serviced.
Pumps, valves, etc. are dimensioned for the required flows.
The unit has been tested for leaks and tightness.
Bleeding performed (re-bleeding may be necessary).

Electrical installation

Proper wiring, performed according to current regulations.
Correct connection to the controlling product.

Customer information (adapted to the relevant installation)

Start-up with customer/installer.
Review of the cooling unit's function.
Installation and maintenance manual supplied to the customer.
Check and filling, system.
Information on fine adjustments, settings, etc.
Information on potential operational malfunction and remedial action.
Guarantees and insurance.
Information and procedure for fault registration.