Sign In
Upload
Download
Table of Contents
Contents
Add to my manuals
Delete from my manuals
Share
URL of this page:
HTML Link:
Bookmark this page
Add
Manual will be automatically added to "My Manuals"
Print this page
×
Bookmark added
×
Added to my manuals
Manuals
Brands
Idex Manuals
Paint Sprayer
FAST&FLUID SK300 CE
Manual
Remove The Transport Brackets; Dispose Of The Packaging Material; Put The Machine In Position; Move The Machine From The Pallet - Idex FAST&FLUID SK300 CE Manual
Hide thumbs
1
2
Table Of Contents
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
page
of
23
Go
/
23
Contents
Table of Contents
Troubleshooting
Bookmarks
Table of Contents
Advertisement
lnstallation
4.1.5
Remove the transport brackets
1. Remove the screws (A).
2. Remove the transport brackets (B).
4.1.6
Dispose of the packaging material
1. Dispose of the packaging material in an environmentally
friendly way, according to local regulations, see § 2.7.
4.2
Put the machine in position
4.2.1
Move the machine from the pallet
1. Optionally, place a ramp (A).
2. Push the machine from the pallet on to the ground.
4.2.2
Move the machine to the final location
WARNlNG
Do not use a forklift.
SK300 CE
18
B
A
V. 1.0
17mm
A
4x
Table of
Contents
Previous
Page
Next
Page
1
...
15
16
17
18
19
20
21
22
Advertisement
Table of Contents
Related Products for Idex FAST&FLUID SK300 CE
Idex Sandpiper Signature Series
Idex Sandpiper ST1 1/2
Idex Sandpiper ST40
Idex BAND-IT S10099
Idex BAND-IT S750
Idex BAND-IT S75099
Idex Warren Rupp SANDPIPER Beast SPB20
Idex Semrock U-MF/XL
Idex Semrock FL CUBE EC P and C
Idex HURST eDRAULIC SC 258 E2
Idex HURST eDRAULIC SC 358 E2
Idex HURST eDRAULIC SC 757 E2
Idex HURST eDRAULIC SC 758 E2
Idex Fast & Fluid X-SMART
Idex Fast & Fluid Management Ferraris
Idex FAST & FLUID Galileo
Table of Contents
Print
Rename the bookmark
Delete bookmark?
Delete from my manuals?
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL