Rectangular Horizontal Ducting Preparation - Zephyr Typhoon AK2100CS Use, Care And Installation Manual

Hide thumbs Also See for Typhoon AK2100CS:
Table of Contents

Advertisement

Available languages

Available languages

Installation Instructions

Rectangular Horizontal Ducting Preparation

By default the Typhoon and Hurricane are pre-configured for 7" round vertical ducting.
By default the Cyclone is pre-configured for 6" round vertical ducting.
20
Typhoon, Hurricane, & Cyclone Use, Care, and Installation Guide
1. Using a Philips-head screwdriver
remove the screws and round vertical
transition adapter from the top of the
hood.
2. Using a Philips-head screwdriver,
remove the screws and 3-1/4"x10"
rectangular cover plate from back of
hood.
3. Typhoon ONLY. Remove the two
plastic air diverter blocks. The blocks
are located in the hood and can be
accessed from the top when the round
transition adapter is removed.
C O R E
T Y P H O O N , H U R R I C A N E
& C Y C LO N E
U N D E R - C A B I N E T

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Typhoon AK2100CS and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents