Unpacking The Unit - Maple Systems OMI6700 Series Operation Manual

Light industrial panel pc
Table of Contents

Advertisement

OMI Operations Manual: OMI6700 Series

UNPACKING THE UNIT

Carefully unpack the OMI6700. Check all material in the container against the packing list.
Maple Systems will not accept responsibility for shortages against the packing list unless
notified within 30 days. The equipment and accessories were inspected and tested by Maple
Systems before shipment.
Examine the equipment carefully; if any shipping damage is evident, notify the carrier
immediately. Maple Systems is not responsible for claim negotiations with the carrier.
Save the shipping container and packing material in case the equipment needs to be stored,
returned to Maple Systems, or transported for any reason.
Packing List
OMI6700 Series Light Industrial Panel PC
DC Power Connector (3 pin terminal block)
DC Power adapter with cord
Mounting Clamp Kit
OMI6000 Support DVD
Windows Recovery DVD (for Windows Pro OS only)
OMI Operations Manual: OMI6700 Series
4
4

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OMI6700 Series and is the answer not in the manual?

This manual is also suitable for:

Omi6707aOmi6710aOmi6712aOmi6715a

Table of Contents