Download Print this page

Remington 495 Series Operation Manual page 25

Hide thumbs Also See for 495 Series:

Advertisement

Needed Tools
No.
Tool and meter name
1
valve clearance gauge
valve key dismantling tool
2
3
valve lapper
4
piston ring dismantling tool To check and replace the piston ring
retainer ring dismantling
5
tool
6
jigger tool (gear)
7
Oil pressure meter
8
Oil temperature meter
9
Water temperature meter
10
Charge current meter
Purpose
To adjust the intake and exhaust valve rocker
clearance
To dismantle the intake and exhaust valve
and valve spring
To lap the sealing face between intake and
exhaust valve and seat ring
To dismantling the relative rainer ring
To rotate crankshaft manual at the daily check
and adjust
Monitor and measure main pipe oil
pressure under different working condition
Monitor and measure oil temperature
under different working condition
Monitor and measure water temperature
under different cooling condition
Monitor and measure electrical source
(storage battery) charged capacity
24

Advertisement

loading

This manual is also suitable for:

2100 series4100 series