v. Route all cables from the cable carrier to the cable
management bracket located on the rear of the rack. For
details on cabling, refer to section 7.6.3 - Cabling the Switch
Box and section 7.6.4 - Completing the Cabling.
Figure 47
Bundling the Cable using the Cable Clamps (for Acer
Altos 11000, 12000, or 21000)
9. Secure the server to the rack using four M5 thumbscrews.
Figure 48
Securing the Acer Altos 11000, 12000, or 21000
Server to the Rack
41