1. Product Information

Important key commands

Power On/Off
Testing Set on STANDBY
Ready for switching
on for High Voltage
READY FOR SWITCHING ON
High Voltage
Testing Set is activated
1-4
After pressing push-button switch:
illuminated
- Control lines of the Testing Set are connected to mains.
- Primary circuits of high voltage supply are not connected to
mains.
- Discharge device is connected to high voltage output.
Preconditions:
- All persons must leave hazard area!
- Secure hazard area according to local safety rules and
regulations.
After pressing push-button switch:
- The operating condition 'READY FOR SWITCHING ON' for High
Testing Set is
Voltage is activated. The requirement for clearing the H.V. is met.
- Primary circuits of high voltage supply are not connected to
mains.
- Discharge unit no longer connected to high voltage output.
Clearance
Precondition:
- Testing Set is READY FOR SWITCHING ON
After pressing push-button switch:
illuminated
- Primary circuits of high voltage supply are connected to mains.
- The high voltage output can be alive.
Signal lamps
red
green
illuminated
not illuminated
Signal lamps
red
illuminated
not illuminated
Signal lamps
green
red
illuminated not illuminated