Chapter 2; Installation Instructions; Unpacking And Inspection; Option 01T Installation - Racal Instruments 1260-22 User Manual

High power switch
Table of Contents

Advertisement

Publication No. 980673-055 Rev. A
Unpacking and
Inspection
Option 01T
Installation
Module
Installation
EADS North America Test and Services
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

INSTALLATION INSTRUCTIONS

1. Remove the 1260-22 module and inspect it for damage. If any
damage is apparent, inform the carrier immediately. Retain
shipping carton and packing material for the carrier's
inspection.
2. Verify that the pieces in the package you received contain the
correct 1260-22 module option and the 1260-22 Users Manual.
Notify EADS North America Test and Services, if the module
appears damaged in any way. Do not attempt to install a
damaged module into a VXI chassis.
3. The 1260-22 module is shipped in an anti-static bag to prevent
electrostatic damage to the module. Do not remove the module
from the anti-static bag unless it is in a static-controlled area.
Installation of the Option 01T is described in the Installation and
Setup section of the 1260A-Option 01T Users Manual, Publication
No. 980806-999.
Installation of the 1260-22 Switching Module into a VXI mainframe,
including the setting of switches SW1-1 through SW1-4, SW2, and
SW3, is described in the Installation and Setup Section of the
1260A Option 01T Users Manual, Publication No. 980806-999.
1260-22 User Manual

Chapter 2

Installation Instructions 2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

1260-22a407630407630-001

Table of Contents