Atlas Copco SRD 20 Safety And Operating Instructions Manual

Atlas Copco SRD 20 Safety And Operating Instructions Manual

Rock drills

Advertisement

SRD
20, 25
Safety and operating instructions
Rock drills
© Construction Tools PC AB | 9800 1883 01 | 2017-05-31
Original instructions

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SRD 20 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Atlas Copco SRD 20

  • Page 1 20, 25 Safety and operating instructions Rock drills © Construction Tools PC AB | 9800 1883 01 | 2017-05-31 Original instructions...
  • Page 3: Table Of Contents

    SRD 20, 25 Contents Contents Introduction ..............................5 About the Safety and operating instructions ....................5 Safety instructions ............................5 Safety signal words ..........................5 Personal precautions and qualifications ....................5 Personal protective equipment ......................5 Drugs, alcohol or medication ......................... 5 Installation, precautions ..........................
  • Page 4 Contents SRD 20, 25 Technical data .............................. 20 Machine data ............................20 Noise and vibration declaration statement ..................20 Noise and vibration data ........................21 Accessories ............................. 21 EC Declaration of Conformity ........................22 EC Declaration of Conformity (EC Directive 2006/42/EC) ..............22 ©...
  • Page 5: Introduction

    WARNING Indicates a hazardous Atlas Copco has a strong global sales and service situation which, if not avoided, network, consisting of customer centers and could result in death or distributors worldwide. Our experts are highly serious injury.
  • Page 6: Installation, Precautions

    Safety and operating instructions SRD 20, 25 No person who is under the influence of drugs, Check the locking function by pulling the ► ► alcohol or medication may operate the inserted tool outwards forcefully. machine. WARNING Moving or slipping insertion tool Installation, precautions An incorrect dimension of the inserted tool’s shank...
  • Page 7: Operating, Precautions

    SRD 20, 25 Safety and operating instructions Operating, precautions WARNING Stalling hazard If the insertion tool gets caught during operation, the whole machine will start to rotate if you lose DANGER Explosion hazard your grip on it. This unexpected rotation of the If a warm insertion tool comes into contact with entire machine may cause serious injury or death.
  • Page 8 Safety and operating instructions SRD 20, 25 clothing, and body parts. Examples of controls procedures for protecting workers and others include: exhaust ventilation and dust collection against harmful exposure to dust and fumes systems, water sprays, and wet drilling. Control should be established and implemented based dusts and fumes at the source where possible.
  • Page 9 SRD 20, 25 Safety and operating instructions Changing posture during extended tasks may size result in longer time to complete a task ► help avoid discomfort and fatigue. (and a longer period of exposure to vibration) and may result in or contribute to higher levels In case of persistent or recurring symptoms, ►...
  • Page 10: Maintenance, Precautions

    Safety and operating instructions SRD 20, 25 Keep your hands away from the start and stop ► WARNING Insertion tool hazards device until you are ready to start the machine. Accidental engagement of the start and stop Learn how the machine is switched off in the ►...
  • Page 11: Overview

    Design and function SRD 20 and SRD 25 are pneumatic rock drills designed for vertical drilling, plug hole drilling and drilling in concrete for construction and mining applications.
  • Page 12: Main Parts

    Safety and operating instructions SRD 20, 25 Main parts E. Extra flushing F. Silencer G. Water inlet Labels The machine is fitted with labels containing important information about personal safety and machine maintenance. The labels must be in such condition that they are easy to read. New labels can be ordered from the spare parts list.
  • Page 13: Installation

    Oil is metered into the D. Max. 3 m (10 ft) compressed air hose between compressed air using an Atlas Copco BLG 30 or the lubricator and the machine. CLG 30 lubricator connected to the air line.
  • Page 14: Drill Steel

    Safety and operating instructions SRD 20, 25 Before fitting the insertion tool Check that the tool shank is of the correct size and length for the chuck used. The shank must be clean and the tool must be in good condition.
  • Page 15: Removing The Drill Steel

    SRD 20, 25 Safety and operating instructions Removing the drill steel Preparations before starting Whenever removing the drill steel the following instructions must be observed: Check the drilling equipment 1. Push the retainer outwards in the direction of ◆ Check that all of the drilling equipment is in the arrow until the drill steel collar disengages good condition.
  • Page 16: Start And Stop

    Safety and operating instructions SRD 20, 25 SRD 20 1. Continue to press the start and stop device all the way down to activate full power of the pneumatic rock drill. SRD 25 The rock drill is equipped with a throttle lever for...
  • Page 17: Operating

    1. Pull the throttle lever (A) backwards to the closed position, this will stop the percussion When buying a part, the first thing to do is to verify and rotation. that the part is an Atlas Copco part. Most parts can be identified. Operating Drilling ◆...
  • Page 18: Checking For Wear

    This will lead to stoppages and A. Backhead bolt, (50 Nm, 37 ft.lbf) increased drill-steel consumption. B. Intermediate part pin, for SRD 20 (25 Nm, 18 ft.lbf) and for SRD 25 (30 Nm, 22 ft.lbf) C. Silencer, (8-10 Nm, 6-7 ft.lbf)
  • Page 19: Storage

    SRD 20, 25 Safety and operating instructions Storage Always oil the rock drill well, before you put it • into storage. • Always store the machine in a clean and dry place. Make sure that no foreign matter enters the •...
  • Page 20: Technical Data

    Safety and operating instructions SRD 20, 25 Technical data Machine data Model Part number Piston bore Stroke length Overall length Weight Shank dimension (in.) (in.) (in.) (lb) (in.) SRD 20 E 8311 0320 10 22 X 108 (2.16) (2.36) (23.2) (53) (⅞...
  • Page 21: Noise And Vibration Data

    SRD 20, 25 Safety and operating instructions Noise and vibration data Noise Vibration Declared values Declared values Sound pressure Sound power Three axes values EN ISO 11203 2000/14/EC EN ISO 28927-10 Model r=1m dB(A) rel 20µPa guaranteed dB(A) rel m/s 2 value...
  • Page 22: Ec Declaration Of Conformity

    Safety and operating instructions SRD 20, 25 EC Declaration of Conformity EC Declaration of Conformity (EC Directive 2006/42/EC) We, Construction Tools PC AB, hereby declare that the machines listed below conform to the provisions of EC Directive 2006/42/EC (Machinery Directive), and the harmonised standards mentioned below.
  • Page 24 Any unauthorized use or copying of the contents or any part thereof is prohibited. This applies in particular to trademarks, model denominations, part numbers, and drawings. www.atlascopco.com...

Table of Contents