IBM EMX0 PCIe Gen3 Installing page 20

Hide thumbs Also See for EMX0 PCIe Gen3:
Table of Contents

Advertisement

Figure 2. Removing the filler panels
6. Face the front of the rack and work from the left side to complete the following steps:
Note: If you received a mounting template, you can use the template to mark the locations instead of
using the following steps.
a) Make a note of both the lowest and highest EIA units to be used for the drawer.
b) Use tape, a marker, or a pencil to mark the top mounting hole of the third EIA unit (A) from the
lowest EIA unit you marked. Insert a nut clip at this location.
Note: Mark the rack so that these marks can also be seen from the rear of the rack.
c) Mark the top mounting hole on the lowest EIA unit (B).
d) Count up two holes and place another mark beside that mounting hole (B). You now have two
marks on the rack (B), with one mounting hole between the marks.
6 Power Systems: Installing an EMX0 PCIe Gen3 I/O expansion drawer

Advertisement

Table of Contents
loading

Table of Contents