3Com 7754 Installation Manual page 44

3com 7754: install guide
Hide thumbs Also See for 7754:
Table of Contents

Advertisement

44
C
2: I
HAPTER
NSTALLING
Connecting the PoE
Power Cord
T
S
7750
HE
WITCH
Follow these steps to connect the power cord from the PoE rack:
1 Loosen the mounting screw of the PoE terminal block on the rear panel of the
switch.
2 Insert the -48V OT terminal of the DC power cord to the NEG (-) terminal of the
switch and fasten the mounting screw; insert the other end to the NEG (-) terminal
of the external PoE power supply. See Figure 34 for a detailed view.
Figure 34 Back of the PoE Rack
1 PoE external power input: NEG (-)
2 (+) PoE external power input: NEG (+)
3 COM port (external power monitor)
3 Insert the GND OT terminal of the DC power cord to the RTN (+) terminal of the
switch and fasten the mounting screw; insert the other end to the NEG (-) terminal
of the site power.
Figure 35 Front Panel of the PoE Rack
1 AC input socket
2 DC output terminal: NEG (-)
3 DC output terminal: RTN (+)
4 RS232 serial port
4 Insert the PGND OT terminal of the DC power cord to the grounding screw of the
switch and fasten the mounting screw; insert the other end to the grounding bar
for the switch.
For detailed instructions on how to install the PoE rack, see the Switch 7750 PoE
Rack Installation Guide.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

775777503c168943c168953c168963c16897

Table of Contents