Installing The Switch; Package Contents; Important Steps Before Proceeding - 3Com 4500 Getting Started Manual

Switch 4500 family 26/50-port
Hide thumbs Also See for 4500:
Table of Contents

Advertisement

2

Package Contents

Important Steps
Before Proceeding
I
NSTALLING THE
This chapter contains supplemental information on setting up your Switch 4500.
These details are intended to be read together with the printed documents that
accompany your switch.
Switch unit
Unit Information Labels
Warranty Information
RPS Flyer
Power Cord
Console Cable (RJ-45)
RPS -48V DC Connector and backshell (3CR17571-91 and 3CR17572-91 only)
RPS Connector Cable Tie
Earthing Lead
2 x Front securing brackets
4 x Screws
2 x Back securing brackets and 2 x Screws (3CR17571-91 and 3CR17572-91
only)
4 x Rubber feet
Important Information Notice
Safety and Regulatory Information
Before proceeding, make sure to access the Switch 4500 information on 3Com's
Web site at www.3Com.com and:
Read the document entitled "3Com Switch Family Safety and Regulatory
Information," which contains information on how to set-up your Switch 4500
and all the safety and regulatory warnings.
Refer to the document entitled "Important Information" for instructions on
how to retrieve the latest documentation and software for your switch.
Set-up your switch in the desired location.
Download the documentation to your local hard-drive or to an accessible
server.
S
WITCH

Advertisement

Table of Contents
loading

This manual is also suitable for:

3cr17562-913cr17561-913cr17571-913cr17572-914500 pwr

Table of Contents