Connect Fts And Heated Dual Whip Hose - Graco Reactor A-20 Operation

Air operated, electrically heated plural component proportioner
Hide thumbs Also See for Reactor A-20:
Table of Contents

Advertisement

Setup

Connect FTS and Heated Dual Whip Hose

NOTICE
To prevent damage to probe, do not kink or
excessively bend hose. Do not coil hose
tighter than the minimum bend radius of 3 ft
(0.9 m). Do not subject hose to excessive
weight, impact, or other abuse.
1. Carefully extend FTS probe (H) into the
hose section from the proportioner. Do not
bend or kink probe. Insert in component A
(ISO) side of main hose for foam or poly-
urea systems.
2. Connect FTS (J) to whip hose (W).
3. Connect whip hose ground wire (K) to
ground screw on underside of FTS.
To Proportioner
S
G
F
. 4: Connect FTS and Heated Dual Whip Hose
IG
18
S
R
F
B
A
4. Connect fluid hoses to FTS (J).
To use 1/2 in. (13 mm) ID fluid hoses,
remove the adapters from the propor-
tioner fluid manifold and install them in
the FTS swivel inlets.
5. Connect electrical connectors (D).
6. Connect air hose (C) to whip air hose (L).
7. Connect hose assembly cable (F) to FTS
cable (R). Slide insulator sleeves (S) over
connection. Leave slack (G) in cables as
stress relief, to prevent cable failure.
8. Check hoses for leaks (see your Heated
Hose manual).
D
K
J
H
C
To Gun
B
A
L
W
TI9581C
311511G

Advertisement

Table of Contents
loading

This manual is also suitable for:

253831

Table of Contents