Before First Use - Salente Ario Instruction Manual

Hide thumbs Also See for Ario:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 46
Then place the Y-Ring and Rubber Seal Ring (18) back into
the Lid (2) making sure the hole in the center of the Y-Ring's
cross-section is lined up with the metal pin in the center of the
Lid (2). Press down firmly until the Y-Ring is secured onto
the Lid (2) (Figures 1- 2).
PRESSURE COOKER LID MARKINGS
Please note the "OPEN" and "CLOSE" markings on the rim of the pressure cooker body
(13) and the"
"on the rim of the Lid (2). To properly close and secure the pressure
cooker Lid (2), always line up the "CLOSE" marking on the Upper Ring (9) and the
"
"on the rim of the Lid (2) (Figure 3).
CONDENSATION CUP ASSEMBLY
The Condensation Cup is the clear plastic piece that snaps into
the back side of the pressure cooker as shown in Figure 4. Place
condensation cup in rear of the unit until it locks into place; it is
part 12 in the diagram on page 6.
PRESSURE LIMITING VALVE WARNING
WARNING: Avoid serious injury. Always use tongs or a long
kitchen tool to set the valve to VENTING (Figure 5).
CAUTION HOT STEAM: KEEP HANDS AND FACE
AWAY FROM THE PRESSURE LIMITING VALVE
WHEN ROTATING TO VENTING.

BEFORE FIRST USE

1. Remove packaging materials such as cardboard, plastics or Styrofoam and discard
appropriately.
Figure 3
Figure 4
Figure 5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sleariocz

Table of Contents