Write Protect Switch Operation - Quantum DLT Series Inspection Procedure

Cartridge inspection procedure
Hide thumbs Also See for DLT Series:
Table of Contents

Advertisement

The last thing is to check the proper operation of the Write Protect switch. This should snap back and forth
and the orange tab should be visible when Write Protected.
If the above procedures become habit when handling all cartridges the risk of having problems with the tapes or
damaging the drive are greatly reduced. This VMI should become a normal part or cartridge use.
Revision A 10/98
3
DLT™ and DLTtape™ are trademarks of Quantum Corporation
3

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DLT Series and is the answer not in the manual?

This manual is also suitable for:

Dlttape series

Table of Contents