Installation Checklist

Following are the steps needed to install an MB-240X Wheel Balancer. Perform them in the order
shown.
1. Review the installation Safety Rules.
2. Plan for Electrical Work.
3. Make sure you have the necessary Tools.
4. Select the Installation Site and mounting method. Tire Changer Mount, Mounting Stand, or Wall
Bracket.
5. Verify that there is adequate Clearance on all Sides of the Balancer at the installation site.
6. Gather parts for installation, Mounting Stand (optional), Wall Mount Brackets (optional), or Tire
Changer mount.
7. Unpack the Components.
8. Install the Balancer.
9. Anchor the Balancer.
10. Install the Shaft.
11. Connect to a Power Source,
12. Review the Final Checklist.
MB-240X Wheel Balancer
requires a licensed Electrician for 220 VAC operation