Steps During Initial Operation - Baier 50VA Instruction Manual

24v motor control box
Table of Contents

Advertisement

Initial operation

6.2 Steps during initial operation

Moving door leaf
Danger of injury by squashing, shearing or collision, caused
by moving door leaf.
 Keep area clear during initial operation.
 Carry out electrical connections.
 Refer to chapter 5.3
 Set configuration.
 Refer to chapter 6.1
 Switch power supply on
 Control device in delivery status or after power cut:
Red LED blinks continuously twice with a short break of 1.5 sec.
 Press RESET for about 2 seconds.
 Red LED blinks continuosly.
 Check driving direction of motor with control inputs or service keys:
When pressing OPEN, door has to open and when pressing CLOSE, door has
to close.
 When driving direction is wrong:
Swap motor cables (terminals 1 and 2), check driving direction again.
 Move door in a middle position by pressing and holding the service keys.
 Press RESET for about 2 seconds
 Red LED lights up permanently
 Green LEDs (LED "open" / LED "close") light up during motor activity.
 Drive starts to move on its own.
 Door closes, opens and closes again.
 LEDs go out.
 Test, if door shows desired behavior.
 In case of malfunction check electrical connections and configuration.
 For electrical connection refer to chapter 5.3.
 For configuration refer to chapter 6.1.
 Repeat initial operation, if necessary.
 Initial operation is completed, when function is correct.
24V 50VA Motor control box -
Version 1.0
w w w . b a i e r - g m b h . d e
W A R N I N G
...
...
...
6
Prepare control device
Perform reset
Check function
Instruction Manual
17/20

Advertisement

Table of Contents
loading

Table of Contents