Figure 4.3 Indoor enclosure floor plan and cable entry space (inches)
Table 4.1 Indoor enclosure depth, cable direction, and cable space (inches)
Section Width
Section Depth
"W"
"D"
54
60
22, 30, 38
67
74
©2016 General Electric. All rights reserved.
Courtesy of NationalSwitchgear.com
Front
Horizontal Bus
Compartment
Rating
"FC"
(Amperes)
33
4,000 & Below
33
4,000 & Below
40
5,000 & Below
33
4,000 & Below
40
5,000 & Below
33
4,000 & Below
40
5,000 & Below
AKD-20 AR / Entellisys AR Low-voltage Switchgear
Note 1: Offset ground bus.
If greater than 6 ground lugs are required in the
same section, an offset ground bus is provided.
When the offset ground bus and cable entry is
located both bottom or above, it will reduce the
available cable space.
Note 2: Neutral Bus (Optional) (AKD-20 AR Only).
When this option is provided and the neutral bus
and cable entry is located both bottom or top, it will
reduce the available cable space.
Note 3: Neutral Bus (Optional) (Entellisys AR Only).
When this option is provided and the neutral bus
and cable entry is located both bottom or top, it will
reduce the available cable space.
Note 4: Cable Direction Below.
If the section does not have a circuit breaker in the
"D" compartment, an additional 4 inches of cable
space is available.
General: Secondary control lead space may be
required on left, right, or both sides of cable
compartment. Consult factory drawings for details.
Cable Direction
Cable Space
(Note 4)
"X"
Below
16
Above
20
Below
22
Above
26
Below
15
Above
19
Below
29
Above
33
Below
22
Above
26
Below
36
Above
40
Below
29
Above
33
Section 4. Equipment Installation
AKD-20 AR
Entellisys AR
Only
Only
"N1"
"N2"
9
10.25
24