Definite Time Nps Overcurrent (46Dt); Inverse Time Nps Overcurrent (46It); Table 2.11-1 46Dt Results; Table 2.11-2 46It Results - Siemens 7PG2113 Technical Manual

Feeder protection
Hide thumbs Also See for 7PG2113:
Table of Contents

Advertisement

2.11.1 Definite Time NPS Overcurrent
If DTL setting is small, gradually increase current until element operates.
If DTL is large apply 0.9x setting, check for no operation, apply 1.1x setting, check operation
Apply 2x setting current if possible and record operating time
Phase
Is
DTL
(Amps)
(sec)
NPS
Check correct indication, trip output, alarm contacts, waveform record.

2.11.2 Inverse Time NPS Overcurrent (46IT)

It will be advantageous to map the function being tested to temporarily drive the relevant Pickup output in the
Pickup Config sub-menu in the Output Config menu as this will allow the Pick-up led to operate for the function.
Gradually increase current until Pickup LED operates.
Apply 2x setting current and record operating time,
Apply 5x setting current and record operating time.
Compare to calculated values for operating times
P.U.
Ph.
Dir
D.O.
(NI EI VI LTI,
&
TIMING
NPS
TESTS
Calculated Timing values in seconds for TM =1.0
Curve
IEC-NI
IEC-VI
IEC-EI
IEC-LTI
ANSI-MI
ANSI-VI
ANSI-EI
Note that the operate time may be subject to the Minimum op time setting for the element and/or may have a
Follower DTL applied.
©2010 Siemens Protection Devices Limited
(46DT)
P.U. Current
Tolerance
Amps
Table 2.11-1
46DT Results
Char.
Is
TM
(A)
P.U.
DTL)
(Amps)
Table 2.11-2
46IT Results
2 xIs
10.03
13.50
26.67
120.00
3.80
7.03
9.52
Table 2.11-3
Standard Timings
7PG2113/4/5/6 Commissioning & Maintenance
Operate Time
2 x Is
Operate Current
D.O.
Tol
2 x Is
(Amps)
(sec)
Chapter 6 Page 48 of 77
Tolerance
Operate Time
5 x Is
Tol
(sec)
5 xIs
4.28
3.38
3.33
30.00
1.69
1.31
1.30