Installation - Mira CODA PRO Installation & User Manual

Thermostatic bar valve
Table of Contents

Advertisement

Installation

1.
Install the pipework making sure that it is level and set the correct distance apart
(150 mm) by using the supplied plastic pipe guide.
Important!
1.1
Pipes must be left a minimum of 50 mm long in front of the wall surface.
1.2
Connections are: Hot-Left, Cold-Right. This is very important as the
Mira Coda Pro does not allow for reversed inlets.
1.3
Pipes must be straight and at 90° to the finished wall surface.
Pipe Centres in Wall
HOT
2.
Fit the plastic pipe guide over the inlet
pipes to hold them in position.
3.
Leave the plastic pipe guide in place
and finish the wall.
150
COLD
Plastic Pipe Guide
11
50 mm Minimum
Inlet Pipes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents