Mira CODA PRO Installation & User Manual page 10

Thermostatic bar valve
Table of Contents

Advertisement

General
Installation must be carried out in accordance with these instructions, and must be
conducted by designated, qualified and competent personnel.
The installation must comply with the "Water Supply Regulations 1999 (Water
Fittings)" or any particular regulations and practices, specified by the local water
company or water undertakers.
Note! Make sure that all site requirements correspond to the information given in
section: 'Specifications'.
1.
The mixer must not be installed in an area where it may freeze.
2.
For stud partitions alternative fixings may be required.
3.
Isolating valves must be installed close to the mixer for ease of maintenance.
4.
Pipework must be rigidly supported and avoid any strain on the connections.
5.
Pipework dead-legs should be kept to a minimum.
6.
Decide on a suitable position for the
mixer. The position of the mixer and
the shower fittings must provide a
minimum gap of 25 mm between
the spill-over level of the shower
tray/bath and the handset (refer to
illustration). This is to prevent back-
siphonage.
Note! Only use shower fittings
recommended by the manufacturer
or supplier.
7.
All pipework must be checked for
leaks before the product installation
is completed. The product should
be pressurised and the inlet & outlet
connections inspected.
10
Soap Dish/Hose
Retaining Ring
25 mm
Spill Over
Level

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents