Rigging Basin Section; Joining Multi-Cell Units Basin Sections - EVAPCO ATC-E Rigging And Assembly Instructions

Evaporative condensers and closed circuit coolers
Table of Contents

Advertisement

ATC-E, ATC-ES, ATWB, eco-ATWB and eco-ATWB-E Evaporative Condensers and Closed Circuit Coolers

Rigging Basin Section

Lifting devices are located in the upper corners of the basin
section for lifting and final positioning purposes as shown in
Figures 1a and 1b. The hook of the crane must be a minimum
dimension of "H" above the top of the section being lifted to
prevent undue strain on the lifting devices. See Table 2 for the
minimum "H" dimension. These lifting devices should not be
used for extended lifts or where any hazard exists unless
safety slings are employed under the section. (See "Extended
Lifts" section for proper arrangement.) Bolt the basin section to
the steel support before rigging the coil/fan section.
Basin Section Length
Feet
Meters
3 - 6
0.9-1.8
8.5
2.6
9
2.7
10.5
3.2
12
3.6
14
4.3
18
5.5
20
6
21
6.4
24
7.3
28
8.5
36
11
40
12.2
Table 2 - Minimum "H" Dimension for Basin Sections
Joining Multi-Cell Units
On all 2-cell models, the two bottom sections are shipped
separately and are typically furnished with a connecting equalizer
flume box between them.
In addition to the equalizer flumes, these units are provided with
horizontal drip channels and vertical splash guards to keep water
from splashing out from between the cells. All units have one or
more horizontal drip channel and two vertical splash guards per
flume box. Flume boxes are a standard offering on multi-cell units.
The equalizer flume box is factory installed on one section for field
connection to the other. It is important to connect the equalizer
flume to balance the water level in the pans for proper pump
suction operation. The procedures that follow should be
performed in sequence.
Min. "H" Dim.
Feet
Meters
8
2.4
10
3
10
3
11
3.4
15
4.6
17
5.2
19
5.8
21
6.4
22
6.7
15
4.6
16
4.9
19
5.8
21
6.4
LIFTING
EARS
Figure 1a - Basin Section up to 21' (6.4m) long
LIFTING
EARS
Figure 1b - Basin Section 24' (7.3m) to 40' (12.2m) long
VERTICAL
SPLASH
GUARD
FLUME BOX
SEALER
TAPE
Figure 2 - Equalizer Flume Connection, 12' (3.6m) Wide Models
4
H
H
HORIZONTAL
DRIP
CHANNEL
RETAINING
CLIP