Installing Watertight Partitions & Firewalls - EVAPCO ATC-E Rigging And Assembly Instructions

Evaporative condensers and closed circuit coolers
Table of Contents

Advertisement

ATC-E, ATC-ES, ATWB, eco-ATWB and eco-ATWB-E Evaporative Condensers and Closed Circuit Coolers
Installing Watertight Partitions & Firewalls
In some cases, a multi-cell unit is ordered with watertight partitions to allow for independent cell operation. To correctly assemble the
upper sections to the bottom sections, access to the rigging seams in between cells is necessary. To facilitate with this access, the
upper watertight partition is shipped loose for installation in the field. Figure 17 below provides instruction to install these in the field.
Note: The below instruction and arrangement also applies for Factory Mutual (FM) Approved multi-cell units, in which
case these partitions will be referred to as firewalls.
(2) MOUNTING CHANNELS
INSTALLED BY SHOP PRIOR
TO SHIPPING.
LOWER PARTITION WALL
INSTALLED BY SHOP
PRIOR TO SHIPPING. MAY
BE ONE PIECE FOR END
TO END UNITS.
UPPER PARTITION WALL TO
SHIP LOOSE FOR FIELD
INSTALLATION AFTER UNIT IS
RIGGED, IF NECESSARY.
Figure 17 - Upper Partition/Firewall Installation in Field
15
1/4Ø (8) 20 X 1" LG
FULLY THREADED HHCS
1/4" (8) WIDE
FLAT WASHER
SEALER TAPE
AND CAULK AS
NECESSARY
WING BOLTS
UPPER
PANEL
TAPPERS
LOWER
PANEL
APPLY SEALER TAPE
TO BOTH SIDES FOR
COMPRESSION
1/4Ø (8) BRASS RIVNUT