Quick-Check; Preventative Maintenance - Flowserve Valtek MaxFlo 3 Installation Operation & Maintenance

Control valves
Table of Contents

Advertisement

Table I: Line Flange Bolting Specifications
MaxFlo 3 flanged
Nominal
Valve
Size x Length
Pressure /
size
Rating
Inches
Metric
ANSI 50
/ X .6
M X 65
ANSI 300
5/8 X 3.
M6 X 80
DN5
"
PN 6
M X 70
PN 40
M X 70
ANSI 50
/ X .88
M X 70
ANSI 300
3/4 X 3.6
M0 X 95
DN40
½"
PN 6
M6 X 80
PN 40
M6 X 80
ANSI 50
5/8 X 3.5
M6 X 85
ANSI 300
5/8 X 3.5
M6 X 90
DN50
"
PN 6
M6 X 85
PN 40
M6 X 85
ANSI 50
5/8 X 3.6
M6 X 95
ANSI 300
3/4 X 4.5 M0 X 0
DN80
3"
PN 6
M6 X 85
PN 40
M6 X 95
ANSI 50
5/8 X 3.6
M6 X 95
ANSI 300
3/4 X 4.5
M0 X 5
DN00
4"
PN 6
M6 X 85
PN 40
M0 X 00
ANSI 50
3/4 X 3.75 M0 X 05
ANSI 300
3/4 X 4.88 M0 X 5
DN50
6"
PN 6
M0 X 00
PN 40
M4 X 5
ANSI 50
3/4 X 4.5 M0 X 0
ANSI 300
7/8 X 5.5
M X 40
DN00
8"
PN 6
M0 X 00
PN 40
M7 X 35
ANSI 50
7/8 X 4.6 M X 0
ANSI 300
 X 6.5
M4 X 55
DN50
0"
PN 6
M4 X 0
PN 40
M30 X 50
ANSI 50
7/8 X 4.75 M X 0
ANSI 300
 /8 X
M7 X 70
DN300
"
PN 6
M4 X 5
PN 40
M30 X 60
4

QUICK-CHECK

Before commissioning, check the control valve by fol-
lowing these steps:
4.
Check for full stroke by varying the instrument signal
settings appropriately. Observe the plug position in-
dicator located on the actuator or the positioner. The
plug should change position with a smooth turning
movement.
4.
Check all air connections for leaks. Tighten or replace
any leaking lines.
4
®
MaxFlo 3 flangeless
Size x Length
Qty/ valve
Inches
Metric
8
/ X 6.75
M X 70
8
5/8 X 6.88
M6 X 75
8
M X 75
8
M X 75
8
/ X 7.50
M X 90
8
3/4 X 8.38
M0 X 5
8
M6 X 00
8
M6 X 00
8
5/8 X 8.38
M6 X 5
5/8 X 3.50
M6 X 90
6
5/8 X 8.50
M6 X 0
8
M6 X 5
8
M6 X 5
8
5/8 X 0.5
M6 X 65
3/4 X 4.5
M0 X 0
6
3/4 X .00
M0 X 80
M6 X 85
6
M6 X 55
M6 X 95
6
M6 X 65
5/8 X 3.6
M6 X 95
6
5/8 X .5
M6 X 95
6
3/4 X 4.5
M0 X 5
3/4 X .5
M0 X 35
M6 X 85
6
M6 X 85
M0 X 00
6
M0 X 300
3/4 X 3.75
M0 X 05
6
3/4 X 3.5
M0 X 340
3/4 X 4.88
M0 X 5
4
3/4 X 4.00
M0 X 360
M0 X 00
6
M0 X 335
M4 X 5
6
M4 X 350
6
3/4 X 4.5
M0 X 360
7/8 X 5.5
M X 40
4
7/8 X 5.9
M X 390
M0 X 00
4
M0 X 350
M7 X 35
4
M7 X 385
4
3
4
4
4
3
4
3
User instructions - MaxFlo 3 - VLENIM0052-02 02.07
4.3
Check packing box bolting for proper tightness.
CAUTION: Do not overtighten packing. This can cause
Qty/ valve
excessive packing wear and high stem friction that may
4
impede shaft movement. After the valve has been in serv-
4
ice for a short period, recheck the packing-box nuts. If
4
the packing-box leaks, tighten the nuts just enough to
4
stop the leak.
4
4
4
4.4
Make sure the valve fails in the correct direction in case
4
of air failure. This is done by positioning the valve at mid-
4
stroke and turning off the air supply and observing the
4
failure direction. If the action is incorrect, see the sec-
6
tion "Reversing the Air-action" in the instructions of the
4
installation, operation and maintenance manual of the
4
appropriate actuator.
4
4
6
5

PREVENTATIVE MAINTENANCE

6
At least once every six months, check for proper op-
5
eration by following the preventative maintenance steps
6
outlined below. These steps may be performed while the
5
valve is in-line and without interrupting service. If an in-
4
ternal problem is suspected, refer to section "Valve Dis-
6
assembly".
4
6
5.
Look for signs of gasket leakage through the end flanges
6
5
and bonnet. If necessary, re-torque flange, bonnet and
6
post bolting.
5
4
5.
Examine the valve for damage caused by corrosive fumes
6
or process drippings.
8
8
5.3
Clean the valve and repaint areas of severe oxidation.
4
6
4
5.4
Check the packing-box for proper tightness. If there is
6
a persistent leak, change the packing after referring to
8
sections "Valve Disassembly and Body Reassembly".
4
0
CAUTION: Do not overtighten packing. This can cause
8
excessive packing wear and high friction that may im-
8
pede shaft movement.
8
8
5.5
If the valve is equipped with a lubricator, add lubricant if
necessary.
5.6
If possible, stroke the valve and check for smooth, full-
stroke operation. Unsteady shaft movement may indicate
an internal valve problem.
5.7
Check the calibration of the positioner. For further pre-
ventative maintenance, see the instructions in the instal-
lation, operation and maintenance manual for the appli-
cable positioner.
5.8
Ensure all accessories, brackets and bolting are securely
fastened.
5.9
If possible, remove air supply and observe actuator for
correct fail-safe action.
5.0
Check the actuator and all air connections for leaks.
5.
If an air filter is supplied, check and replace the cartridge
if necessary.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Valtek MaxFlo 3 and is the answer not in the manual?

Questions and answers

Table of Contents