FAN COIL
INSTALLATION MANUAL
TC18C2DWB1
TC24C2DWB1
TC37C2DWB1
TC48C2DWB1
TC60C2DWB1
©2015 Innovair Corporation. All Rights Reserved.
www.innovair.com

Advertisement

loading

Summary of Contents for innovair TC18C2DWB1

  • Page 1 FAN COIL INSTALLATION MANUAL TC18C2DWB1 TC24C2DWB1 TC37C2DWB1 TC48C2DWB1 TC60C2DWB1 ©2015 Innovair Corporation. All Rights Reserved. www.innovair.com...
  • Page 2: Table Of Contents

    Installation Installation Precaution on Installation.........21 Vacuum Dry and Leakage Checking......22 Additional Refrigerant Charge .........24 Water Drainage ............25 Insulation Work ............28 Wiring .................29 Test Operation ............30 Installation...
  • Page 3: Precaution On Installation

    Precaution on Installation 1. Precaution on Installation 1). Measure the necessary length of the connecting pipe, and make it by the following way. Connect the indoor unit at first, then the outdoor unit. Bend the tubing in proper way. Do not harm them. Specially Notice the pipe length/height/dimension of each capacity.
  • Page 4: Vacuum Dry And Leakage Checking

    Vacuum Dry and Leakage Checking MLCAC-UTSM-2010-06 2. Vacuum Dry and Leakage Checking Vacuum Dry: use vacuum pump to change the moisture (liquid) into steam (gas) in the pipe and discharge it out of the pipe to make the ¦ pipe dry. Under one atmospheric pressure, the boiling point of water(steam temperature) is 100 . Use vacuum pump to make the pressure in the pipe near vacuum state, the boiling point of water falls relatively.
  • Page 5 Vacuum Dry and Leakage Checking . Special vacuum dry procedure This vacuum dry method is used in the following conditions: There’s moisture when flushing the refrigerant pipe. Rainwater may enter into the pipe. Vacuum dry for the first time ······ 2h pumping .
  • Page 6: Additional Refrigerant Charge

    Additional Refrigerant Charge MLCAC-UTSM-2010-06 3. Additional Refrigerant Charge Caution a) Refrigerant cannot be charged until field wiring has been completed. b) Refrigerant may only be charged after performing the leak test and the vacuum pumping. When charging a system, care shall be taken that its maximum permissible charge is never exceeded, in view of the danger of liquid hammer.
  • Page 7: Water Drainage

    Water Drainage 4. Water Drainage 4.1 Gradient and Supporting 1). Keep the drainpipe sloping downwards at a gradient of at least 1/50. Keep the drainpipe as short as possible and eliminate the air bubble. 2). The horizontal drainpipe should be short. When the pipe is too long, a prop stand must be installed to keep the gradient of 1/50 and prevent bending.
  • Page 8 Water Drainage For Four-way cassette 4.4 Convergent drainage 1). The number of indoor units should be as small as possible to prevent the traverse main pipe overlong. 2). Indoor unit with drain pump and indoor unit without drain pump should be in different drainage system. 3).
  • Page 9 Water Drainage Stop the air conditioner running, turn off the power, and put back the cover. Stop the air conditioner. After 3 minutes, check if it has abnormity. If the collocation of drainpipes is illogical, the water will flow back overfull, which will cause the alarm lamp flashes, even overflow from the water receipt plate.
  • Page 10: Insulation Work

    Insulation Work MLCAC-UTSM-2010-06 5. Insulation Work 5.1 Insulation material and thickness 1). Insulation material ¦ Insulation material should adopt the material which is able to endure the pipe’s temperature: no less than 70 in the high -pressure side, no ¦ less than 120 in the low -pressure side(For the cooling type machine, no requirements at the low-pressure side.)
  • Page 11: Wiring

    Insulation Work For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal with, at the same time, at two ends of the pipe, remain some length not to be insulated, in order to be welded and check the leakage after laying the pipes. 3).
  • Page 12: Test Operation

    Test Operation 7. Test Operation (1) The test operation must be carried out after the entire installation has been completed. (2) Please confirm the following points before the test operation. The indoor unit and outdoor unit are installed properly. Tubing and wiring are correctly completed. The refrigerant pipe system is leakage-checked.