Selecting An Installation Position - Huawei SUN2000 Series User Manual

Hide thumbs Also See for SUN2000 Series:
Table of Contents

Advertisement

SUN2000-(20KTL, 29.9KTL, 30KTL, 36KTL, 40KTL)-
M3
User Manual
Type
Tools and Instruments
Steel measuring tape
Heat shrink tubing
Person
al
protec
tive
equip
ment
(PPE)
Safety gloves
Safety boots

4.3 Selecting an Installation Position

Basic Requirements
Issue 01 (2020-10-15)
Level
Heat gun
Safety goggles
-
The SUN2000 is IP66-rated and can be installed indoors or outdoors.
Do not install the SUN2000 in a place where a person can easily be exposed
to its enclosure and heat sinks, because these parts are extremely hot during
operation.
Do not install the SUN2000 in areas with flammable or explosive materials.
Do not install the SUN2000 in a place within children's reach.
The SUN2000 will be corroded in salt areas, and the salt corrosion may cause
fire. Do not install the SUN2000 outdoors in salt areas. A salt area refers to
the region within 500 m from the coast or prone to sea breeze. The effect
from sea breeze depends on weather conditions (such as typhoon and season
wind) or terrains (such as dams and hills).
Copyright © Huawei Technologies Co., Ltd.
4 Installation
Hydraulic pliers
-
Anti-dust mask
-
18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents