Test Button - Eaton Cooper Power Systems LCR 6200 RFN Instructional Leaflet

Load control switch
Table of Contents

Advertisement

LCR 6200 Radio Frequency Load Control Switch (Brazil)
Installing the LCR 6200 RFN
Perform the following steps to install an
LCR 6200 RFN:
1. Mount the LCR 6200 RFN at the desired
location, which is preferably a flat, non-
vibrating surface.
The LCR enclosure has two pre-drilled mounting
tabs. Eaton's Cooper Power Systems
recommends pan head screws up to 1/4 inch in
size for mounting the LCR. The distance between
the mounting holes is 8.25 inches (20.955 cm),
and the diameter of the mounting holes is 5/16
inches (0.79375 cm).
For a rain-tight rating, mount the LCR so that the
"This Way Up" arrow on the label points up.
2. Remove electrical power from the AC circuits
that are to supply power to the LCR and the
load to be controlled.
WARNING Dangerous voltages are present.
Multiple disconnects may be required to de-
energize all circuits.
AVERTISSEMENT Présence de tensions
dangereuses. Il pourrait être nécessaire de
procéder à des débranchements multiples
pour mettre tous les circuits hors tension.

Test Button

The Test button, located on the LCR board, can
perform the following functions:
Cancel Cold Load Pickup at Power-On
Push and hold the Test button while applying power
to the unit to cancel cold load pickup.
NOTE: Pushing the Test button multiple times does
not increment the control time by an
additional amount of time.
4
3. Wire the LCR 6200 RFN according to the wiring
diagram located on the LCR cover.
Install the wiring within a 1/2 inch liquid-tight,
non-metallic, flexible conduit or make sure the
wiring is close nippled into an approved junction
box or wiring compartment.
All wiring connections are made to factory-
installed leads that are rated for 600 VAC, 105° C.
The output leads are not polarized.
CAUTION Incorrect connections can
damage the LCR when power is applied.
Follow all applicable Local and National
Electrical Codes when wiring the LCR.
MISE EN GARDE Un branchement incorrect
à la puissance d'entrée peut endommager le
LCR au moment de la mise sous tension.
Conformez-vous à tous les codes de
l'électricité locaux et nationaux pertinents
pour procéder au branchement du LCR.
4. Apply electrical power to the LCR.
5. If desired, perform a test shed or test a
secondary paging frequency as described in
the section
"Test
Button".
6. Record the LCR address and other information.
7. Close the LCR cover, secure the latch, and
install a utility seal.
Test Relay Control
Push for less than 5 seconds and release the Test
button to control the relay for 1 minute.
The relay control initiated by the Test button is
implemented as a standard timed load control
command, zero delay, and zero random extension.
This overrides any other currently implemented or
delayed control.