Download Print this page

SA Sport 365 Assembly Instructions Manual page 8

Just for kids cantilever bar

Advertisement

Base and Cable Tie Down Floor Anchor Installation
Note: 8 anchors in total for this assembly, drill & install anchors as described on page 7.
Mark out the location of the 4-Cable Tie-down anchors using the dimensions shown below (Fig. 10).
1.
Use the Diagonal Measurement (11' 7") to ensure the 4 anchors are square to each other. Install the
Floor anchors, as explained on page 7 Installing Anchors. Then install Threaded Socket Adaptors.
Next Center the cantilever assembly within this anchor pattern. Use the holes in the base legs as
2.
guides for drilling the 4 upright base anchors, as explained on page 7 Installing Anchors. Install the
Anchors and fasten the Bases Down. Replace plastic caps in the base leg holes after installation.
BASE LEG
HOLE
FLOOR ANCHOR
(THREADED SOCKETS)
Ensure the floor Anchors are properly set or the safe use of the equipment may be compromised
3. Attach the tie down cables using the quick links to the top of each Cantilever Upright & tighten
Quick links using 2 adjustable wrenches, then secure the other end to the turnbuckle hook and chain
to the Threaded Socket Adaptors (floor anchors) and. See Figure 11 below for connection points.
4. Once all 4 cables are connected properly, the cables can be tightened using the turnbuckles. Tighten
each Turnbuckle equally so that the uprights remain perpendicular to the floor. See next section for
complete instructions on rail and turnbuckle adjustments.
Do not over tighten the turnbuckles as this
may warp or damage the uprights, see note
on subsequent page, about Adjustments.
365 / Instruction #8920101 Rev 4
QUICK LINK CONNECTION
Pg. 8
CABLE TIE DOWN FLOOR ANCHORS (4)
BASE LEG ANCHORS (4)
Fig. 11
TURNBUCKLE CONNECTION TO
THREADED SOCKET ADAPTORS
(FLOOR ANCHORS)
Fig. 10
THREADED SOCKET
ADAPTORS (4)
TURNBUCKLE

Advertisement

loading

Related Products for SA Sport 365