BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a
Drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
WARNING: Only for domestic use
Not suitable for children under 36 month
To be used under direct supervision of an adult
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

loading

Summary of Contents for Walton 5x5 Corner Playhouse

  • Page 1 WARNING: Only for domestic use 02CORPLAY0505-V1 Not suitable for children under 36 month To be used under direct supervision of an adult 5x5 Corner Playhouse BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you CAUTION MUST pilot drill all screw Every e ort has been made during the - Check the pack and make sure you have all the parts listed.
  • Page 2 02CORPLAY0505-V1 Please retain product label and instructions for future reference Overall Dimensions: Width = 1516mm Panel Frame - 28x28x1240mm Depth = 1516mm FS2828-1240mm Height = 1384mm Base Dimensions: Eaves Frame - 28x28x884mm QTY 2 Width = 1405mm FS2828-884mm Depth = 1405mm Before assembly Eaves Frame - 28x28x1436mm QTY 2 please make sure you have a...
  • Page 3 Please retain product label and instructions for future reference Nail Bag Step 2 50mm Screws x20 30mm Black Screws x23 Position a window (No. 6) into each window panel (No. 2) and secure the 20mm Black Screws x5 40mm Screws x37 window into place using 4x window blocks (No.
  • Page 4 Please retain product label and instructions for future reference Step 5 Step 4 Attach the panel frame (No. 9) to the Following the same method rear of the left gable (No. 3) using outlined in Step 4 x the rst window panel (No.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Place the assembled roof panel on top Fix the 2x “L” brackets to either end of the ridge bar using 2x20mm screws of the building and x into position using 30mm screws.
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 11 Step 12 Cut the felt (No. 23) into 2x strips and lay Arrange the cover strips (No. 16) at front onto the roof, making sure to lay the felt and side(s) of the building and x into from the rear of the building to the front...
  • Page 7: After Treatment

    Please retain product label and instructions for future reference Step 13 Place the door knob (No. 22) on the outside of the door, screwing into the desired position. Pre drill hole It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled.