Download Print this page

Mitsubishi Electric 700 Series Installation Manualline page 5

Hide thumbs Also See for 700 Series:

Advertisement

PRODUCT CHECKING AND PARTS IDENTIFICATION
General Precaution
The bus capacitor discharge time is 10 minutes. Before starting wiring or inspection, switch power OFF, wait for more than 10
minutes, and check for residual voltage between terminal P/+ and N/- with a meter etc., to avoid a hazard of electrical shock.
Environment
Before installation, check that the environment meets following specifications.
-10°C to +50°C (14°F to 122°F) (non-freezing)
Surrounding air
temperature
Ambient humidity
90% RH or less (non-condensing)
Storage temperature
-20°C to +65°C (-4°F to 149°F) (Temperature applicable for a short time, e.g. in transit.)
Ambience
Indoors (free from corrosive gas, flammable gas, oil mist, dust and dirt)
Maximum 1,000m (3280.80feet) above sea level. After that derate by 3% for every extra 500m
Altitude, vibration
(1640.40feet) up to 2500m (8202feet) (91%).
5.9m/s
Note
Install the inverter on a strong surface securely and vertically with bolts.
Leave enough clearances and take cooling measures.
Avoid places where the inverter is subjected to direct sunlight, high temperature and high humidity.
Install the inverter on a non-combustible wall surface.
2
2
or less at 10 to 55Hz (directions of X, Y, Z axes)
Measurement
position
Inverter
5cm
(1.97inches)
5cm
Measurement
(1.97inches)
position
5cm
(1.97inches)

Hide quick links:

Advertisement

loading