Handler IV Operator's Manual page 19

Batch and induction tank
Table of Contents

Advertisement

Agitation jets can be adjusted downwards
or both to the rear depending on
operator preference and the type of
product being mixed (See fig. 5.11)
Figure 5.11 Agitation Jets (Inside Tank)
8
Once the desired mixture is achieved, close agitation
valve(s) to prevent continued recirculation.
9
Open valve #3 (discharge valve) to send Handler tank
contents to sprayer tank. (See Fig 5.8)
10 Close valve #3 once tank is filled to desired level or all
product has been delivered.
11 Turn valve #1 (three way valve on suction side of
system) to "off position"
12 Turn off pump. If tank rinsing is desired then continue
to the next step.
13 To rinse lines and tank, turn valve #1 on to draw from
nurse tank.
14 Start pump.
15 Open agitation valves (valves #4 & #6), and flush the
lines.
16 Close agitation valve(s) and open rotoflush valve (valve
#5) to flush inside of tank. (See Fig. 5.6)
17 Once the inside of the tank is flushed then close
rotoflush valve and turn three-way ball valve (valve #1) so
it draws from the Handler tank.
18 Open valve #3 (discharge valve) and send rinsate to
sprayer tank.
19 Repeat steps #13 to #18 as necessary to rinse tank.
Page 18
Note
PLUMBING SYSTEM
OPERATION
(with pump installed)
Ensure pump engine oil level is full before operation.
Please use same instructions as "Plumbing
Package Operation".

Advertisement

Table of Contents
loading

Related Products for Handler IV

Table of Contents