Connecting The Lift Arms To The Cutting Unit - Toro Groundsmaster 200 Series Operator's Manual

62 guardian recycler mower
Hide thumbs Also See for Groundsmaster 200 Series:
Table of Contents

Advertisement

5. Mount the rear of the lift arm to the lift cylinder with a
pivot pin and 2 cotter pins (supplied with the traction
unit).
1
Figure 3
1. Pivot pin
2. Lift arm
6. Hook the brake return spring to the hole in the lift arm
(Fig. 3).
7. Install the wheel and tire assembly. Torque the wheel
nuts to 45–55 ft.-lb. (61–75 N m).
8. Repeat the procedure on the opposite side of the
machine.
Connecting the Lift Arms to the
Cutting Unit
1. Move the cutting unit into position in front of the
traction unit.
2. Measure the distance from the end of each lift arm to
the center of the ball joint (grease fitting). The distance
should be 2 in. (51 mm) (Fig. 4). If distance is not 2 in.
(51 mm), loosen the jam nut securing the ball joint to
the lift arm and rotate the ball joint in or out until the
distance is attained. Do not tighten the jam nuts at this
time.
2
4
3
3. Lift arm pivot bracket
4. Brake return spring
1
2 in.
(51 mm)
2
1. Lift arm
2. Ball joint
3. Move the lift lever to the Float position. Push the lift
arms down until the holes in the ball joint mounts line
up with the holes in the castor arms.
4. Secure the ball joint mounts to each castor arm with 2
capscrews (7/16 x 3 in.), flat washers (7/16 in.), and
flange nuts (7/16 in.). Position the flat washers to the
outside of the castor arm (Fig. 5).
Note: The ball joint mount should be above the castor arm
when it is assembled.
5
4
1
1. Castor arm
2. Ball joint mount
3. Ball joint
10
Figure 4
3. Jam nut
Figure 5
4. Capscrew
5. Washer
6. Flange nut
3
3
2
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

30569

Table of Contents