Download Print this page

Waterworks HIGHGATE HGPB30 Installation Manuallines

Pressure balance with diverter trim

Advertisement

Quick Links

HIGHGATE
Pressure Balance with Diverter Trim
White Porcelain Lever Handle
Style No. HGPB30
SPECIFICATIONS:
Rough-in Depth Minimum: 1-7/8"
Rough-in Depth Maximum: 2-7/8"
Integrated Diverter: Yes
REQUIRED PLUMBING DETAILS:
Universal Pressure Balance with Diverter Valve
STYLE # GUPB87R
CODE # GUSV87R
IMPORTANT:
To ensure this product is installed properly, you
must read and follow these guidelines.
The owner/user of this product must keep this
information for future reference.
This
product
is
Waterworks
Universal
Diverter Valve (Style # GUPB87R). The risk of
scalding exists until the installer has properly
calibrated/adjusted the temperature setting during
final trim installation.
The bottom outlet of the GUPB87R is intended for
use with a tub spout only. The use of any fitting with
a restricted flow, such as a handshower, will cause
the diverter to not function properly.
Do not use Pex piping from the valve to the tub
spout. This will cause too much back pressure for
the valve to function properly.
Be sure your installation conforms to federal state,
and local codes. In the State of Massachusetts, all
installations
must comply with the rules and
These guidelines have been prepared for the professional contractor to aid in the installation of:
HIGHGATE PRESSURE BALANCE TRIM WITH PORCELAIN LEVER HANDLE WITH DIVERTER
(STYLE# HGPB30)
All dimensions are based on original specification and are subject to change and variation.
Please consult your Design Associate for current specifications.
6.6.2012
intended
to
work
with
Pressure
Balance
INSTALLATION GUIDELINES
regulations set forth within 248 CMR.
This product must be installed by a professional
licensed contractor.
Refer to the specifications and assembly drawings
attached. Product is sold partially assembled but
shown fully disassembled for illustrative and service
purposes only.
Inspect this product to ensure you have all the parts
required for proper installation.
This product must be on-site prior to rough-in which
allows the installer to visualize the installation.
Use only a strap wrench or protected/smooth-jaw
wrench on any finished surface.
VALVE OPERATION:
1.
When the finished wall is complete, turn on the hot
and cold supplies and pull off the tile guard. Valve
will not operate unless BOTH supplies are turned on.
2.
The
lever
temperature only, not volume. Place the handle on
the valve stem so it rests at 6 o'clock in the OFF
position and then turn the handle counter clockwise
through the cold, then warm and stopping at the hot
position. If additional rotational friction is required to
maintain the handle position, tighten the packing
nut. See Figure-01.
3.
Allow the valve to run in the warm position for a few
minutes to completely flush the system. If system is
quite dirty, remove valve spindle to ensure proper
flushing. Refer to the Installation Guidelines for the
Pressure Balance Valve which contains a complete
parts breakdown and related information.
Figure - 01
the
with
handle
(5)
is
for
controlling
Finished Wall
Valve Spindle
Plastic Washer
Bonnet
Packing Nut
the
Page 1 of 3

Advertisement

loading
Need help?

Need help?

Do you have a question about the HIGHGATE HGPB30 and is the answer not in the manual?

Questions and answers

Summary of Contents for Waterworks HIGHGATE HGPB30

  • Page 1 Figure - 01 The owner/user of this product must keep this information for future reference. This product intended work with Waterworks Universal Pressure Balance with Diverter Valve (Style # GUPB87R). The risk of scalding exists until the installer has properly Finished Wall calibrated/adjusted the temperature setting during final trim installation.
  • Page 2: Trim Installation

    HIGHGATE INSTALLATION GUIDELINES Pressure Balance with Diverter Trim HOT LIMIT SAFETY STOP CALIBRATION: and washer (4). IMPORTANT: Pressure Balance Valve 10. Re-insert the indice (1) with the o-ring (2) into the equipped with a hot limit safety stop screw to limit handle.
  • Page 3 HIGHGATE INSTALLATION GUIDELINES Pressure Balance with Diverter Trim Description Indice, Highgate O-Ring Handle Screw Lock Washer White Porcelain Lever Handle Nose Cone Cap Nose Cone Trim Screw O-Ring Diverter Lever Trim Plate Retaining Clip Gasket These guidelines have been prepared for the professional contractor to aid in the installation of: HIGHGATE PRESSURE BALANCE TRIM WITH PORCELAIN LEVER HANDLE WITH DIVERTER (STYLE# HGPB30) All dimensions are based on original specification and are subject to change and variation.
  • Page 4 service parts STYLE HGPB10 Highgate Pressure Balance Control Valve Trim with White Porcelain Lever Handles STYLE HGPB30 Highgate Pressure Balance with Diverter Trim with White Porcelain Lever Handles...
  • Page 5: Limited Lifetime Warranty

    STUDIO Over thirty years of experience distilled into signature fi ttings, surfaces, textiles, and accessories. Waterworks Studio is an edited collection of design solutions curated to be concise, engineered to be complete, and crafted for quality. Everything you need, nothing more.
  • Page 6 ++SUPPLIED AS A PAIR MAIN KITS 537281* VALVE FACEPL ATE KIT 788757* VALVE FACEPL ATE KIT 412905* GL AND COVER KIT 359274*++ 944827* NOSE CONE KIT TRIM SCREW KIT 103601* HANDLE KIT 103602* INDICE KIT PRODUCT SUPPORT: 1 (800) 927-2120 (EXT 2) WWW.WATERWORKS.COM/STUDIO...
  • Page 7: Kit Components

    T R I M PL AT E O-R ING O-R ING GA SK ET CL IP 537281* T R I M PL AT E VALVE FACEPL ATE KIT INDICE O-R ING DI V ERT ER L EV ER PRODUCT SUPPORT: 1 (800) 927-2120 (EXT 2) WWW.WATERWORKS.COM/STUDIO...
  • Page 8 VA LV E FAC EPL AT E K I T 788757* VA LV E FAC EPL AT E K I T H A N DL E 224846 M ETA L WA SHER HANDLE SCREW KIT SCR EW DOCUMENT: SPHG05_REV01 PRODUCT SUPPORT: 1 (800) 927-2120 (EXT 2) WWW.WATERWORKS.COM/STUDIO...
  • Page 9 PRODUCT SUPPORT 60 BACKUS AVENUE DANBURY, CT 06810 1 (800) 927-2120 (EX T 2) W W W.WATERWORKS.COM/ST UDIO...

This manual is also suitable for:

Highgate gupb87r