TPS61007EVM-177 EVM User's Guide for High Efficiency , Boost Converters User’s Guide October 2000 Power Management Products SLVU039...
Page 2
IMPORTANT NOTICE Texas Instruments and its subsidiaries (TI) reserve the right to make changes to their products or to discontinue any product or service without notice, and advise customers to obtain the latest version of relevant information to verify, before placing orders, that information being relied on is current and complete. All products are sold subject to the terms and conditions of sale supplied at the time of order acknowledgment, including those pertaining to warranty, patent infringement, and limitation of liability.
Page 3
Preface About This Manual This user’s guide describes the TPS61007EVM-177 (SLVP177) evaluation module for high-efficiency boost converters. How to Use This Manual Chapter 1 Introduction Chapter 2 Evaluation With the TPS61007EVM-177 Chapter 3 Printed Circuit Board (PCB) Layout Information About Cautions and Warnings This book may contain cautions and warnings.
The TPS61007EVM-177 is an adjustable boost converter whose output voltage is set to 3.3 V. If any other output voltage needs to be evaluated, the TPS61007EVM-177 can be easily set up to provide an output voltage between 1.5 V and 3.3 V by modifying the external resistor divider.
Setup of the EVM 1.3 Setup of the EVM It is important to establish all connections to the EVM before the power supply connected to the EVM is turned on. 1) Connect a power supply (0.9 V to V , depending on the output voltage of the EVM) to the INPUT header.
Chapter 2 Evaluation With the TPS61007EVM-177 This chapter details the evaluation process and features of the EVM. For this evaluation, a load is connected to the output terminal in order to adjust the load current between 0 mA and 250 mA.
(R5, R6) is used on the EVM to monitor the supply voltage. As a default on the EVM, the LBO output will go low when the supply voltage falls below 0.9 V. More details about setting the low battery threshold voltage can be found in the data sheet (SLVS279). Evaluation With the TPS61007EVM-177...
PCB Layout of the TPS61007EVM-177 (SLVP177) 3.1 PCB Layout of the TPS61007EVM-177 (SLVP177) Figure 3–1. Component Placement Figure 3–2. Top Layer PCB Layout...