Top Body Piston Assembly

(Figure 6)
P4
Step 12: Install –012 O-rings (K) into the grooves of the both
the Outside Piston (J) and the Top Inside Piston (M). Slide
G
a –010 O-ring (N) into the stem of the Top Inside Piston (M).
Step 13: Attach two Pilot Posts (L) to the Outside Piston (J)
with 2, 8-32 x 1/2" SHCS (I).
K
Step 14: Slide the Pilot Post/Outside Piston combination
through the Top Body (G), and attach it to the Top Inside
N
Piston (M) with 2, 8-32 x 1/2" SHCS (I).
K
P4
G
K
N
© 2016 General Electric Company. All rights reserved.
L
P3
M
I
I
J
L
P3
M
I
Figure 6

Bottom Body Piston Assembly

(Figure 7)
Step 15: Install –012 O-rings (K) into the grooves of the both
the Outside Piston (J) and Bottom Inside Piston (O).
Step 16: Attach two Pilot Posts (L) to the Bottom Inside Piston (O)
with 2, 8-32 x 1/2" SHCS (I).
Step 17: Slide the Pilot Post/Bottom Inside Piston combination
through the Bottom Body (H), and attach it to the Outside
Piston (J) with 2, 8-32 x 1/2" SHCS (I).
I
K
P1
K
I
I
K
P1
K
I
Becker VRP-SB-PID Series Natural Gas Controllers Instruction Manual | 30
O
L
H
P2
J
Figure 7
O
L
H
P2
J

Advertisement

Table of Contents
loading

Table of Contents