FAS26xx Series Systems
Installation and Setup Instructions
Prepare for installation | 1
1. Go to
Pre-setup
2. Unpack all boxes and inventory contents.
3. Go to the
- Download and complete the
- Watch the videos listed under
In the box
Cluster Interconnect cables
Part number X6566B-05-R6 (112-00297)
You provide
2U per chassis
mysupport.netapp.com
and
create an
AFF and FAS System Documentation Center
Cluster Configuration
Setup
Data and cluster Interconnect cables
10 GbE network cables
(order dependent)
Part number X6566B-2-R6 (112-00299)
or X6566B-2-R6 (112-00299)
or X6566B-3-R6 (112-00300) or X6566B-5-R6 (112-00301)
Optical network cables (order dependent)
Part number X6553-R6 (112-00188) or X6554-R6 (112-00189) or X6536-R6 (112-00090)
Rack space
Screwdriver
Prepare for installation
1
account,
register your
system, and
and click FAS26xx series, and then Installation and Setup:
Worksheet.
videos.
Ethernet cables
Additional network cables
For connecting your storage system to your
network switch and Microsoft
Install hardware
Cable storage
2
get your license
keys.
Storage cables
mini-SAS HD to mini-SAS HD cables
Part number X66030A (112-00435) or X66031A (112-00436)
or X66032A (112-00437) or X66033A (112-00438)
Additional cables
Power cables
micro USB console cable
With a USB/serial connection and access to a
Web browser to configure your storage system
®
Windows
®
client
Complete system setup
and configuration
3
4
Client
215-15014_A0