NetApp FAS2800 Installation And Setup Instructions

NetApp FAS2800 Installation And Setup Instructions

Advertisement

Quick Links

FAS2800 Systems
Installation and Setup Instructions
Prepare for installation | Stage 1
Pre-setup
Contents
in the box
Cables in your shipment
are order-dependent. Not all
cables shown may be
in your shipment.
Note: For more cable
information and part numbers,
see the
Hardware
Universe.
You provide
Prepare for installation
1. Unpack all boxes and inventory contents.
Attention: Customers with specific power requirements must check
2. Watch the
Setup
Videos.
3. Review the
NetApp ONTAP Configuration
10Gb Ethernet, SFP28
25Gb Ethernet, SFP28
Network cable
Network cable
Part numbers:
Part numbers:
X6566B-05-R6, .5m
X66240A-05, .5m
X6566B-2-R6, 2m
X66240-2, 2m
X66240A-5, 5m
32Gb Fiber Channel,
MiniSAS HD cable
SFP+ (target/initiator)
Storage connections
Network cable
Part numbers:
X66030A, 0.5m
Part numbers:
X66031A, 1m
X66250-2, 2m
X66032A, 2m
X66250-5, 5m
X66250-15, 15m
Rack space
Screwdriver
2U per chassis
Phillips #2
Install hardware
1
2
Hardware Universe
Guide.
10GBASE-T, RJ45
Network cable
Part numbers:
X6561-R6
X6562-R6
Additional cables
Ethernet cables
Power cables
Additional network cables
For connecting your storage system
to your network switch and laptop
or console
Cable storage
Complete system setup
3
and configuration
for their configuration options.
Cable management arms
Slide rail kit
Laptop or console
With a USB/serial connection and
access to a Web browser to configure
your storage system
4
June_2023_Rev1_FAS2800_ISI

Advertisement

loading
Need help?

Need help?

Do you have a question about the FAS2800 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for NetApp FAS2800

  • Page 1 FAS2800 Systems Installation and Setup Instructions Prepare for installation Install hardware Cable storage Complete system setup and configuration Prepare for installation | Stage 1 1. Unpack all boxes and inventory contents. Attention: Customers with specific power requirements must check Hardware Universe for their configuration options.
  • Page 2 Install hardware | Stage 2 Install the system CAUTION LIFTING HAZARD 1. Use the rail or telco kit instructions to install controllers and shelves in the rack. Use the the 42U 1280 mm System Cabinet Guide for cabinet installation. ≥ 41.23 lbs (≥ 18.7 kg) Back of 2.
  • Page 3 Cable storage | Stage 3 Cable FAS2800 series to external DS224C or DS212 drive shelves Storage cables Insert mini-SAS HD cable tab DOWN and gently push into place until it clicks. Connect the shelf‐to‐shelf ports. Connect Controller A to the drive shelves.
  • Page 4 Download and install Active IQ Config Advisor Register your system 2. Verify the health of your system by running Config Advisor. 3. After you have completed the initial configuration, go to the NetApp ONTAP Resources page for information about configuring additional features in ONTAP.