Download Print this page

Advertisement

Quick Links

AFF A220 or
FAS2700 Systems
Installation and Setup Instructions
Prepare for installation | Stage 1
1. Click
and
register your
Pre-setup
2. Unpack all boxes and inventory contents. For more cable information and part numbers, see the
3. Go to the
- Download and complete the
- Watch the videos listed under
.
In the box
Part number X6566B-05-R6 (112-00297)
Optical network cables (order dependent)
X6554-R6 (112-00189) or X6536-R6 (112-00090)
You provide
Rack space
2U per chassis
mysupport.netapp.com
and then
create/log in to your
system.
AFF and FAS System Documentation Center
Cluster Configuration
Setup
videos.
Unified configuration (order dependent)
A
B
1
2
Data and cluster Interconnect cables
Cluster Interconnect cables
Part number X6566B-2-R6 (112-00299) or
or X6566B-2-R6 (112-00299)
X6566B-3-R6 (112-00300) or X6566B-5-R6 (112-00301)
Part number X6553-R6 (112-00188) or
Part number X6585-R6 (112-00291)
Screwdriver
Phillips #2
Prepare for installation
1
account,
download and install Active IQ Config
and click AFF A220 and FAS2700 systems, and then Installation and Setup:
Worksheet.
10 GbE network cables
(order dependent)
CAT6 RJ-45 cables
or X6562-R6 (112-00196)
Additional network cables
For connecting your storage system to your
network switch and laptop or console.
Install hardware
Cable storage
2
Advisor,
Hardware
Ethernet configuration (order dependent)
A
B
1
2
Storage cables
mini-SAS HD to mini-SAS HD cables
Part number X66030A (112-00435) or X66031A (112-00436)
or X66032A (112-00437) or X66033A (112-00438)
Additional cables
Ethernet cables
Power cables
Laptop or console
With USB/serial connect or direct
switch connect and access to a Web browser
to configure your storage system
Complete system setup
and configuration
3
4
Universe.
micro USB console cable
215-13080_E0

Advertisement

loading

Summary of Contents for NetApp AFF Series

  • Page 1 Complete system setup and configuration AFF A220 or FAS2700 Systems Installation and Setup Instructions Prepare for installation | Stage 1 1. Click mysupport.netapp.com and then create/log in to your account, download and install Active IQ Config Advisor, register your system.
  • Page 2 Install hardware | Stage 2 Install system in a rack or cabinet CAUTION LIFTING HAZARD • Install the rail or telco tray kits, as needed, and then install and secure your system using the instructions included with the kit, or see the 42U 1280 mm Back of the controller System Cabinet Guide...
  • Page 3 Cable storage | Stage 3 Cabling an AFF A220 or FAS2700 series WITH external storage (DS224C) Attention: Be sure to check the illustration arrow for the proper cable connector pull-tab orientation. Pull-tab Note: To unplug a cable, gently pull the tab to release the locking mechanism. Storage cables Connect the shelf-to-shelf ports Connect each node to IOM A in the stack...
  • Page 4 Use System Manager Guided Setup to configure your cluster Completing setup 1. Verify the health of your system by running Config Advisor. 2. After you have completed the initial configuration, go to the NetApp ONTAP Resources page for information about configuring additional features in ONTAP.

This manual is also suitable for:

Fas2700 seriesAff a220Fas2700Fas2750Fas2720