Download Print this page

Other Precautions - Sinclair KNX-02 Installation & Owner's Manual

For sdv5 full dc inverter systems

Advertisement

II. Other precautions
Installation Location
Do not install the unit in a place with much oil, steam, sulfide gas. Otherwise, the
product may be deformed and failed.
Preparation before installation
1. Check whether the following assemblies are complete.
No.
Name
1
KNX-02
Cross round head wood
2
mounting screw
Cross round head
3
mounting screw
4
Installation Manual
5
Plastic expansion pipe
6
Plastic screw bar
3-core shielded cable
7
Qty.
1
3
GB950-86 M4X20 (For Mounting on the Wall)
M4X25 GB823-88
2
(For Mounting on the Electrical Switch Box)
1
For Mounting on the Wall
3
For fixing on the 86 electrician box
2
For connecting the indoor unit and KNX-02
1
3
Remarks

Advertisement

loading