ABB ACS880-107 Series Hardware Manual page 95

Inverter units
Hide thumbs Also See for ACS880-107 Series:
Table of Contents

Advertisement

Action
Powering up the main circuit of the drive
Start the supply unit according to the instructions in its hardware manual.
On-load checks
Start the motor to perform the ID run.
Check that the cooling fans rotate freely in the right direction, and the air flows upwards.
Check that the motor starts. stops and follows the speed reference in the correct direction when controlled
with the control panel.
Check that the motor starts. stops and follows the speed reference in the correct direction when controlled
through the customer-specific I/O or fieldbus.
Drives in which the Safe torque off control circuit is in use: Test and validate the operation of the Safe
torque off function. See section
Drives with an emergency stop circuit (options +Q951, +Q952, +Q963, +Q964, +Q978, +Q979): Test
and validate the operation of the emergency-stop circuit. See the delivery specific circuit diagrams and
wiring, start-up and operating instructions of the option.
Drives with the Prevention of unexpected start-up with safety relay (option +Q957): Test and validate
the operation of the Prevention of unexpected start-up circuit. See the delivery specific circuit diagrams
and wiring, start-up and operating instructions of the option.
Test and validate the operation of Prevention of unexpected start with FSO-xx (option +Q950): Test
and validate the operation of the Prevention of unexpected start-up circuit. See the delivery specific
circuit diagrams and wiring, start-up and operating instructions of the option.
Acceptance test procedure (page
192).
Start-up 95
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs880-107-004a8-3Acs880-107-006a0-3Acs880-107-008a0-3Acs880-107-0011a-3Acs880-107-0014a-3Acs880-107-0018a-3 ... Show all

Table of Contents